Skip to content

The Lido – Valentines Park

The Project

Commissioned by Redbridge Council, the Lido in Valentines Park is the first new Lido to be built in east London in decades. Costing £11m, this project is part of a redevelopment of leisure facilities for the people of Redbridge.

the-lido-THE-VALENTINES-LIDO
The Project

The new Lido will help boost the local market and economy and provide a sustainable and social outdoor space for the people of the Redbridge area. Additionally, the new building and its facilities will contribute to the restoration of the heritage of Valentines Park.

The construction of the Lido in Valentines Park is committed to sustainability. Therefore, Encon Associates were appointed to provide Ecological Support, Landscape Architecture, Tree Survey, Thermal Modelling, Energy Assessment, Daylight and Sunlight Analysis, Acoustic Surveys, Traffic and Transport Assessment, and BREEAM before any construction works commenced.

Development Site Area: 52 hectares
Gross Floor Area: 1.72 hectares
Additional Services:

  • TM54 Unregulated Energy Modelling
  • Low or Zero Carbon Study
  • Sustainability Champion
POOL THE VALENTINES LIDO
RECEPTION THE VALENTINES LIDO
the lido

BREEAM Assessment and Achievements:

Contribution to BREEAM Achieved 71% (Design Stage) – BREEAM Excellent

SPLASH PAD THE VALENTINES LIDO
POOL THE VALENTINES LIDO
Play Video

Contribution to Planning Consent

  • Mitigated the loss of existing trees with an extensive landscaping scheme including the planting of a new woodland and a number of individual specimen trees
  • Achieve a Biodiversity Net Gain in excess of 15%
  • Ensure the design achieves a BREEAM Excellent rating
COLONNADE THE VALENTINES LIDO
CAFE THE VALENTINES LIDO

Images and video designed and designed by Wake Morley Architects

The Lido – Swept Path Analysis

“Working as part of the design team alongside the local authority, to create the new lido at Valentines Park, was very much a collaborative effort, blending our expertise with the vision and community requirements of the area. I believe this helped us produce a facility which not only enhances the already popular destination but also celebrates the history of the park.”

Mark Bentley – Director

BATHING AREA THE VALENTINES LIDO

Want to gain environmental credits or need planning advice for your next project?

We have been delighted with the service from Encon Associates throughout and for their help in achieving a BREEAM Very Good rating on both phases of our Bishop Auckland retail park project.

The online IES TaP system meant I was able to keep a close eye on how things were progressing from start to finish – an excellent facility.

Finally, thanks for your own personal contribution and guidance which was invaluable – very much appreciated.  I’d have no hesitation in recommending Encon Associates and look forward to working with you on future projects.

Gordon Blackwood, Argon Properties
Breeam
CIHT
CIOB
Construction Online
The Institute Of Structural Engineers
Elmhurst Approved Energy Assessor
ecology and environmental management logo
CIBSE-Cert-LCC-UKAS-Colour-cropped
infrared training center
OneClickLCA_highreslogo
IES survey _ Environmental policy bulletin services _ Society for the Environment
Monitoring Air Quality
Breeam
CIHT
CIOB
Construction Online
The Institute Of Structural Engineers
Elmhurst Approved Energy Assessor
ecology and environmental management logo
CIBSE-Cert-LCC-UKAS-Colour-cropped
infrared training center
OneClickLCA_highreslogo
IES survey _ Environmental policy bulletin services _ Society for the Environment
Monitoring Air Quality
Breeam
CIHT
CIOB
Construction Online
The Institute Of Structural Engineers
Elmhurst Approved Energy Assessor
ecology and environmental management logo
CIBSE-Cert-LCC-UKAS-Colour-cropped
infrared training center
OneClickLCA_highreslogo
IES survey _ Environmental policy bulletin services _ Society for the Environment
Monitoring Air Quality